With the construction of nuclear power station, its necessary facility, polar crane is laid on more attention. 伴随着核电站的兴建,其必用设备-环吊越来越受到企业的重视。
Study on Polar Crane Dynamics of Nuclear Power Plant 核电站环吊大车运行动力学研究
Ut on Brackets Supporting Polar Crane of NPP Heavy Steel Structure 核电厂大型钢结构环吊(支座)牛腿的UT检测
Improvement of Static Load Test Technology for Polar Crane in Ling 'ao Nuclear Power Station 岭澳核电站环形吊车静载荷试验的技术改进
The result gives some significant theory for the security design of polar crane for nuclear power plant. 仿真结果为核电站环行起重机的安全性设计提供了重要的理论依据。
Due to the special nature of nuclear power equipment, the polar crane must have extremity security. 由于核电设备的特殊性,因此对核电站环行起重机的安全性要求极高。
The main work is as follows: ( 1) The static model of hook block of polar crane is established and the hoisting vertical deflection analysis system is developed. 本文主要工作如下:(1)建立了核电站环行起重机吊钩组的静力学模型,开发了核电站环行起重机吊钩组升降垂线偏差分析系统。
The polar crane for nuclear power plant runs on a circular orbit on the top of the reactor plant, lifts the pressure vessel cover and components for reactor, and the positioning accuracy of polar crane must be strictly controlled. 核电站环行起重机运行于核反应堆厂房上方的环形轨道上,用于吊运反应堆压力容器顶盖和堆内构件,对其吊装定位精度要求极高。
Polar crane for nuclear power plant moves on the circular orbit that laying the upper of the reactor plant. It is one of the important hoisting equipments in nuclear power plant. 核电站环行起重机沿着位于反应堆厂房上部的环形轨道行驶,它是核电站中的重要起重设备之一。